STH 131 Realignment - Vernon County

Cedar Corporation prepared final plans for six concrete haunched slab structures and two prestressed I-girder structures; several curved, all with aesthetic treatments, including special railings and form lined finish. Structures vary in length from 92 to 365 feet (most are 200 feet to 300 feet). The first phase (4 of 8 bridges) was completed in two months.

We also prepared final plans for four retaining wall structures (1100 feet total length). Wall types include post and panel, sheet piling with concrete form liner fascia, and split block retaining walls.

The project was selected for WisDOT Construction Award.